What Happens on MST HIBP

1999

 Jan

 Feb

Mar

Apr

 May

 Jun

 Jul

 Aug

 Sep

 Oct

 Nov

 Dec
2000

 Jan

 Feb

 Mar

 Apr

 May

 Jun

 Jul

 Aug

 Sep

 Oct

 Nov

 Dec
2001

 Jan

 Feb

 Mar

 Apr

 May

 Jun

 Jul

 Aug

 Sep

 Oct

 Nov

 Dec

January, 2000

 Mon  Tue  Wed  Thu  Fri  Sat  Sun
 31          1  2
 3  4  5  6  7  8  9
 10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

 

Jan-08-2000

Test the array detector which was used on the inter-science project before.

Trying to get the secondary signals out of the large noises detected.

Different bias schemes are used. The bias power supply is not working in the positive direction.

Jan-29-2000

Repeat the array test. Try positice and negative bias.

Noise level is about 15uA with bias, 100-200uA w/o bias.